REVISED HEALY SCHEDULE: 07 JUL ARR DUTCH HARBOR.
DISEMBARK KEIGWIN MISSION SCIENTISTS (MISSION HLY-02-02).
REFUEL. ONLOAD MAIL/PARTS/FOOD STORES. THREE DAYS OF
MID-DEPLOYMENT R AND R FOR EACH DUTY SECTION. 12 JUL DPT
DUTCH HARBOR FOR NOME. 15 JUL
ARR NOME (ANCHOR) FOR BSL. EMBARK SBI SCIENTISTS. 17 JUL DPT NOME ON 40-DAY SBI PHASE 2 (MISSION
HLY-02-03) 26 AUG ARR NOME (ANCHOR) FOR BSL. DISEMBARK SBI
SCIENTISTS UPON ARRIVAL. EMBARK KEIGWIN SCIENTISTS AS THEY
ARRIVE. TAKE BARGE ALONGSIDE TO OFFLOAD SBI OPTICS VAN AND
ONLOAD KEIGWIN VIBRACORE EQUIPMENT. 28 AUG DPT NOME ON 20-DAY
KEIGWIN PHASE 2 (MISSION HLY-02-04). 17 SEP UTILIZE HELOS
TO TRANSFER KEIGWIN SCIENTISTS TO BARROW AND LTT RIDERS TO
HEALY. COMMENCE TRANSIT TO HI, CONDUCTING LTT
ENROUTE. 29 SEP ARR HONOLULU HI FOR
PVST. 04 OCT DPT HONOLULU. 12 OCT ARR SEATTLE.
Note that any gear left on the ship will return to
Seattle on 12 October. Andy Heiberg will coordinate with Mike Woodrum (Healy
science officer) for shipment to PI home addresses. Note that we will post a SBI
return label (list PI/lead technician name) on the SBI cruise link page for your
use. Make sure you have given the lead MST on the Healy (Glen Hendrickson) and
Andy Heiberg (SBI) an electronic copy of your cargo manifest and instructions
for method of cargo shipment for gear once it returns to Seattle. Please review
the cargo shipping instructions on the SBI webpage, cruise link, for Healy
operations. FYI, Tom Weingartner (Chief Scientist for the SBI mooring cruise on
the USCGC Polar Star) is the contact for any shipping logistics for that
cruise.
|